Toggle navigation
Home
About Us
History
Gallery
Current projects
Forms
Contact Us
Gallery
Home
Gallery
Gallery
Check out some of our past projects.
1223 16th street
115,000 sq ft medical office with surgical suites, as well as automated parking below. Completed in 2011.
Bell Pasadena
212 Unit Apartment Building in Pasadena, CA that includes subterranean parking, pool, fitness facility and a resident lounge. Completed in 2016.
USC-HSC Currie Hall
316,790 sq ft, 178 unit student housing with 2, 3, and 4 bedroom apartments. Located in Los Angeles, CA. Completed in 2016.
Currie Hall
316,790 sq ft, 178 unit student housing with 2, 3, and 4 bedroom apartments. Located in Los Angeles, CA. Completed in 2016.
The Arroyo
64 Unit project built for CCSM in Santa Monica, CA. Project was built specifically for low-income residents. Completed in 2019.
4700 Telegraph
Multi-family residences, modular built, with 48 units. 65,000 sq ft. Completed in 2019.
Talaria at Burbank
Design Build 241 unit residential building in Burbank, CA. The building is complete with a 760- car garage, gym, swimming pool, common areas and a Whole Foods Market. Completed in 2019.
Talaria at Burbank
Design Build 241 unit residential building in Burbank, CA. The building is complete with a 760- car garage, gym, swimming pool, common areas and a Whole Foods Market. Completed in 2019.
4801 Shattuck Pl
43 unit multi use apartment building with retail in Oakland, CA. Built with modular units. Completed in 2017.
1223 16th street
Medical Office building constructed for Santa Monica, CA. 115,000 sq ft space built with medical equipment and surgical suites.
4700 Telegraph
Multi-family residential with 48 modular units. 65,000 sq ft. Completed in 2019.
Andalucia
118 unit mixed-use apartment and townhouse development in Old Town Pasadena, CA, with retail on ground floor. Completed in 2016.
Avalon of Thousand Oaks
144 unit resort style community in Thousand Oaks, CA.
Occidental College
132 unit student housing at Occidental College. 195,000 sq feet. Completed in 2008.
Village Walk Tarzana
149,00 sq ft, outdoor shopping center in Tarzana, CA. Completed in 2004.
Wilshire Victoria
60 high end units on Wilshire Corridor in Westwood, CA. Completed in 2009.
Bedford Parc
172 unit condominium/apartment units in Baldwin Hills, CA. Completed in 2007.
2802 Pico
33 unit mixed-use project with retail and residential. 60,000 sq feet. Completed in 2013
Avalon Pasadena
138,000sq ft mixed use with 120 units and ground floor retail in Pasadena, CA. Completed in 2003.
High Place East
45 units of affordable housing in Santa Monica, CA. Completed in 2009.
Oakwood Miracle Mile
60 units design build in Los Angeles, CA. Completed in 2007.
University Village
299 units senior living facility built on 65 acres, with residences, located on Ventura County. Completed in 2005.
Prado on Lake
103 units, mixed use project with ground floor retail, in Pasadena, CA. Completed in 2005
Teramachi Homes
127 condominium units in Little Tokyo, built as senior housing. Completed in 2010.
Golden Road Brewery
Brewery, cold storage and a pub located in Los Angeles, CA. Completed in 2013.